Subsurface Utility

Engineering

SUE LEVEL D, C, B & A

Planview USL supports all quality levels of SUE
while managing the associated risks with utility
coordination, mapping, relocation, condition
assessment and design.

The Planview USL SUE team adheres to the 38-
02/38-22 ASCE and CSA S250 standards. Our
SUE team reduces utility conflicts, enhances
safety and mitigates unnecessary alignment
changes, translating to a reduction in utility
relocation costs and a savings in design and
construction costs.

Level D: This is the most basic level of SUE
and is typically used for project and route
planning and uses existing utility records/maps
and as-built drawings.

Level C: Locating and surveying visible above
ground utility end points and capturing invert
measurements on catch basins and manholes.

Level B: The application of surface geophysical
methods to determine the existence,
whereabouts and horizontal position of the
utility.

Level A: “Daylighting” The utility is exposed in
a “Test Pit” using non-destructive methods like
hydro-vacuuming. The utility is captured via
GPS coordinates to 1.5 cm level accuracy. The
highest level of accuracy available.

THE PLANVIEW USL DIFFERENCE

As utility experts, we leverage the power of geospatial
data by delivering utility GPS coordinates into your GIS
application for enhanced usability across your
organization.

Our SUE Infrastructure Team provides customized project
management for utility conflict resolution and re-design
throughout the entire utility relocation process. Detailed
reporting, GIS dashboards and interactive mapping inform
customers of resolved and unresolved utility conflicts
throughout the duration of their construction project.

Planview USL provides alternatives to traditional
topographic surveys by using LiDAR, putting time and
money back into your budget.

UTILITY INVESTIGATIONS

  • CCTV Investigations • Topographic Survey
  • Invert/Obvert Analysis • LiDAR Scanning
  • Chamber Assessments • GPR Scanning

DELIVERABLES

  • Updated CAD Design
  • Civil 3D Design
  • Test Pit Diagrams/Matrix
  • Condition Assessment Report
  • Hyperlinked Imagery
  • Utility Conflict Summary